Power your property with clean solar energy.
Engineered rooftop and commercial solar from AARIS INFINITY PRIVATE LIMITED — Tier-1 bifacial modules, hybrid lithium backup and end-to-end WBSEDCL net metering, handled for you.
Indicative: 4.2 kWh/kW/day, ₹60,000/kW residential. Final design follows a site audit.
Take the step and switch
to clean power
built for decades.
From structural audit to subsidy credit, one accountable engineering team delivers solar that performs for 25 years and more.
Architectural-grade solar, engineered around your roof
- 01
PM Surya Ghar subsidy, handled
₹30,000 per kW up to 2 kW and ₹18,000 for the 3rd kW. We manage registration, paperwork and tracking until the subsidy reaches your bank account.
- 02
Tier-1 bifacial modules
Dual-glass, high-efficiency panels that also harvest reflected light for more units per square foot.
- 03
Hybrid lithium backup
LiFePO4 storage keeps lights, fans and refrigeration running through outages.
- 04
End-to-end WBSEDCL net metering
Application, inspection, bi-directional meter and grid sync — coordinated for you.
We size every system honestly and build it like it is our own roof. If solar doesn’t make sense for you, we will tell you so.Arijit MitraFounder & Managing Director, AARIS INFINITY PRIVATE LIMITED
Founder-led engineering standards
Structural roof audit
Load, shadow and waterproofing checks before a single panel is ordered.
Certified components
BIS/IEC-compliant modules, inverters, DC isolators and surge protection.
Galvanised structures
Wind-rated hot-dip galvanised mounting built for monsoon-season Bengal.
Post-commissioning care
Performance checks, cleaning guidance and a single number to call.
Lock your estimate. We’ll verify it on your roof.
Share your details and our engineers will confirm capacity, subsidy eligibility and the net-metering path — free of charge across Nadia and Murshidabad.
- Free on-site feasibility & shadow analysis
- Transparent quotation with subsidy breakdown
- Direct line to Arijit Mitra for escalations
Commercial, cold storage or hospital load?
3-phase net metering and accelerated depreciation can pay your system back faster.
Savings depend on consumption, sanction load and tariff. Figures are estimates, not guarantees.